
Scheduling flooring work between tenants
A day-by-day schedule for rental turnover flooring: access, strip-out, moisture testing, cure times, handover photographs and the buffer day.
Read the guideCommercial and multi-unit flooring · specification desk
Spec sheet 01 — 2026
Field guides
Turnovers, traffic, wear layers and cleaning rotas — written for the person who signs the purchase order and then has to live with the floor.

A day-by-day schedule for rental turnover flooring: access, strip-out, moisture testing, cure times, handover photographs and the buffer day.
Read the guideSlip ratings are not interchangeable. Compare the pendulum test, R ratings, barefoot A/B/C classes and DCOF, then specify the right test for each wet area.
How to build a rolling ten-year flooring capital plan for a rental portfolio: unit inventory, condition grades, service-life bands, provisions and review.
A specification guide to commercial kitchen floors: failure modes, slip ratings, drainage falls, grout, movement joints and cure time before service.